发布日期:2021-03-17
A.Following a link flap in the BGP speaker’s AS
B.During initial convergence.
C.Following a Route Processor Switchover.
D.Just before sending a CEASE message to tear down the session.
E.During capability negotiation
热门试题
热门资讯
暂无相关推荐~
使用浏览器的分享功能,把这篇文章分享出去
确定