发布日期:2020-04-10
A.Perform a graceful takeover one node at a time and apply the updates.
B.Perform the updates on all nodes simultaneously using C-SPOC utilities.
C.Perform the updates on node at a time with the cluster software active.
D.Perform a graceful stop of all cluster nodes and apply updates to all nodes.
热门试题
热门资讯
暂无相关推荐~
使用浏览器的分享功能,把这篇文章分享出去
确定