The user base of a three-node cluster has increased. In order to add clustered users to all nodes, which of the following steps should be performed?()
Node ’C’ has just completed reintegration in a three-node cluster. The hacmp.out logifle displays The event node_up_complete for Node ’C’. The cluster administrator wishes to verify that the cluster is stable. In addition to reviewing the cluster log files,what utility should be run to verify the cluster state?()
If node 2 is accepting line timing from node 1, node 2 will send ()to node 1 as its SSM message.
A node in a three-node cluster was started, ad it acquired the following three cascading resourcegroups: ’rg1’, ’rg12’, and ’rg3’. The cluster design is to have ’rg1’ normally Node ’A’, ’rg2’ normally on Node ’B’, and rg3’ normally on Node ’C’. How can the administrator reposition the resource groups and correct the problem?()
If node 2 is accepting line timing from node 1, node 2 will send () to node 1 as its SSM messge.
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?()
An administrator wants to install Web SMIT on a node that is not part of a cluster. Which PowerHA filesetprovides this function?()
Which option must you choose to configure Node Manager on a machine (server or zone)?()
You have a two-node Hyper-V failover cluster that uses SAN storage. You are designing storage for a new virtualization environment by using Windows Server 2008 R2. You plan to deploy five virtual machines (VMs) per logical unit number (LUN). You need to be able to perform a live migration of a single VM while the other VMs continue to run on the host server. What should you do?()
Your network contains the following servers: - A two-node Hyper-V failover cluster that runs Windows Server 2008 R2 - A server that has Microsoft System Center Operations Manager 2007 R2 installed - A server that has Microsoft System Center Virtual Machine Manager 2008 R2 installed You need to provide certain users with the ability to create their own virtual machines (VMs). The solution must minimize the number of permissions assigned to the users. What should you do?()