mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest possible power consumption to keep operating costs low. The customer will not increase the capacity of their mainframe applications in the future but rather invest later into their System p servers. Which of the following solutions best meets these requirements at the lowest cost()
Because Phillips reasoned that either accepting or rejecting the proposal were going to upset some political faction,
A B C
he decided to delay the vote until after his reelection. No error
D E
During which phase is a proposal developed and delivered?()
Your customer requires you to supply a configuration or proposal in xl format. What tool is available? ()
Your proposal that they _____ their conversation in French is quite reasonable.
He constantly ______ his proposal that ______ of the budget surplus be used to offer a voluntary prescription drug benefit to seniors.
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()
Once a proposal goes into its place, it’s not likely to reverse it.
Her proposal is that the meeting ()as planned.
Karen: Can you tell me if my proposal was accepted?
Mitchell: ______ But, you can come see me if you have any better ideas.