单选题In a scale-out environment,what is a benefit of running DB2 pureScale compared to other solutions?()
单选题A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()
单选题System software for the Power 780 server is licensed at which tier?()
单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
单选题A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()
单选题A customer has multiple application servers which create one process for each connected user. All users share the same AIX environment. What is a benefit of using WPARs in this environment?()
单选题What operating system is required to support Active Memory Expansion?()
单选题An electrician needs to know what type of receptacle is required. What is the most up-to-date resource to identify the plug type for the feature code ordered?()
单选题A financial company is auditing to ensure their systems are safe from external attack.They have just purchased new Power 750 servers. Which features of AIX 6.1 will help in the auditing process?()
单选题After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()
单选题A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
单选题The system administrator at a university has many stand-alone machines and wants to consolidate them, minimizing the amount of time to upgrade all of the operating systems. Which of the following solutions supports the requirement?()
单选题A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()
单选题An IT manager needs to deploy multiple applications simultaneously. Which virtualization technology will reduce the number of operating system maintenance tasks?()
单选题Which of the following virtualization options are unique to AIX and PowerVM compared to other UNIX based offerings?()
单选题What advantages do WPARs have over LPARs?()
单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()
单选题A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
单选题A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
单选题A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()