IBM认证考试
单选题A solution provider has proposed a pSeries solution to a new customer. The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation. The solution provider has not been able to get a clear understanding as to how the customer will backup the system. What would be the most appropriate action to address the risks with this solution?()
单选题A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
单选题A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
单选题The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
单选题A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
单选题What is one benefit of using the IBM eConfig configuration tool?()
单选题A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()
单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()
单选题An account executive is preparing for an initial one-on-one meeting with a high-level executive who recently read about POWER5 technology. The account executive needs technical assistance to prepare for the meeting. How can a pSeries technical specialist best provide assistance in this situation?()
单选题A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation. There is no manual method to perform the business process. The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()
单选题Which of the following is required to connect a partitioned p5-550 to a modem?()
单选题Which of the following benchmarking ratings cover essentially the same performance metrics associated with commercial applications for IBM UNIX systems?()
单选题A customer needs a very small AIX system to run their new application and is considering a 1-way p615. What key information should the pSeries technical specialist provide to the customer?()
单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()
单选题After months of negotiations and several proposals, the customer indicates that they may be ready to purchase a pSeries system. Rather than quickly ordering the last configuration proposed, what is the most appropriate next step for a pSeries technical specialist to improve the chance of a successful project?()
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()
单选题A customer is planning to implement a Linux solution and is trying to decide whether the application should go on an xSeries 365 with a IA-32 processor or a p5-520 with a POWER5 processor. Which of the following questions would best help them make that determination?()
单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
单选题A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()
当前列表仅展示前20条试题,搜“题王”小程序查看更多考题~