IBM认证考试
单选题The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()
单选题A customer has successfully upgraded their System x servers. Now the are very concerned about their applications. They have a historical collection of various applications that do not interact. Which of the following should the sales professional suggest?()
单选题A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()
单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()
单选题A client is experiencing bottlenecks in their IT environment. Which response address this issue of the following?()
单选题A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()
单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI.They have not been able to practically combine these in the past.Which IBM products meets this need of the following?()
单选题When selling against competition, which focus on the iDataPlex value proposition of the following?()
单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()
单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()
单选题A large customer CIO mentions a friend has used BR to tremendously improve their operations. Which resources would assist the sales professional to develop this opportunity of the following?()
单选题A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request of the following?()
单选题A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()
单选题A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x sales professional recommend to better provision their storage on demand?()
单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()
单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which is causing the problem of the following?()
单选题A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
单选题A customer has reached the cooling limit in his datacenter, but still has room for additional IBM racks and servers. Which allow additinal future sales of the following?()
当前列表仅展示前20条试题,搜“题王”小程序查看更多考题~