A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year. The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year. Which of the following is the best solution to all the customer’s needs?()
If A small business customer required mobility to be delivered via multiple access points, which wireless portfolio of solutions would be the best choice?.()
A customer claims that while redeploying a web application in the production system all their customers are having to log in again. What do you recommend? ()
Customer: I think I’ll have the tomato soup to start._____
Waiter: Right. And would you like croutons in your soup?
Customer: No, thank you.
Waiter: How would you like your steak? Rare, medium or well done?
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()
An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution. What IBM System x server would satisfy this criteria?()
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan. What product should the pSeries technical specialist recommend for this requirement?()